4Sight Case Studies
Determining the Optimal Rail Demand in a Surface Rail Operation
In this project, a simulation model was completed for large stockpile operations and train loading facility within South Africa. The model included train arrivals, loading, slots, capacity evaluation and schedule optimisation.
Read more
Enhancing Power Generation at Kibali Gold Mine with Mtell Asset Performance Management Software
How Predictive Asset Intelligence Improved Reliability and Reduced Unplanned Downtime at Africa's Largest Gold Mine
Read more
Room and Pillar Mine Optimisation Model
An Anglo-American Platinum (Anglo)’s room and pillar platinum mine is in the process of designing two new declines. As part of this process a dynamic simulation model for both rock and personnel logistics was commissioned. SET was appointed to develop these models.
Read more